Technical study, Business plan, deliverable for utilization of the Asbestos mine of MABE (LIFE-Asbestmine program)

…The Technical Study and the Business Plan prepared in the framework of the LIFE-Asbestmine program examine the possibilities and conditions for the utilization of the MABE Asbestos mine in Kozani, as an asbestos waste disposal site.
The projects carried out during the pilot program included the remediation of areas containing scattered asbestos piles and the disposal of 300-tonnes of the asbestos materials that were solidified, in a selected location of the mine. This project was the first substantial step in the remediation of the asbestos-contaminated area.
The continuation of the remediation work will include, as a priority, the cleaning of the buildings from the asbestos found in them and in the machinery. More than 50,000 tons of asbestos remain in the building facilities. The application of the method implemented during the LIFE pilot program will offer a solution for the treatment and inactivation of this large amount of asbestos in buildings. Asbestos, after its solidification, will be available in selected locations of the mine that will be suitably configured to receive the inert materials…

Market study for the utilization of MAVE as a disposal site for asbestos waste

STUDY AND BUSINESS PLAN of MABE as an asbestos waste disposal site

AREA MEASUREMENT SPECIFICATIONS OF THE ASBESTOS MINES OF NORTHERN GREECE – ANKO

UTILIZATION OF MABE ASBESTOS MINE AS A DISPOSAL SITE FOR ASBESTOS WASTES

Asbestos Bible

 


Έργο | European Projects, LIFE
Thematic area | ENVIRONMENT, ENVIRONMENTAL PROTECTION, WASTE MANAGEMENT
Organisation |
Year | 2005, 2006