Local Waste Prevention Plan PRESPA
Contents
1. INTRODUCTION
1.1. The LESS-WASTE project
1.2. Objectives and benefits of the project
2. EXISTING STATUS OF SOLID WASTE MANAGEMENT
2.1. Existing solid waste management – quantitative data
OSDA of Western Macedonia
2.2. Quality composition of waste
Details of existing other MSW management programs
3. NETWORK DESIGN DATA DIALOG AT SOURCE (DsP)
3.1. General
3.2. BIO-WASTE MANAGEMENT PLAN IN PDM
3.3. Determination of biowaste
3.4. Board of Directors Program for settlements >1,500 residents
3.5. Board of Directors Program for settlements of <1,500 residents
4. Selection of collection equipment
4.1. Temporary Storage
Transport Collection Vehicles (T.V.)
2 tn PAYLOAD TIPPING VEHICLE WITH BUCKET LIFTING SYSTEM
4.2. Transshipment Vehicles
THREE-AXLE CONTAINER TRANSPORT VEHICLE WITH LIFTING CAPACITY 20tn
Temporary storage-transload equipment
4.3. Route frequency planning
Route selection and optimization